Thames Water
Barrow Hill Reservoir
Client
|
Overview
EJ engaged the contractors and designers and designed a cover that was made up of several drop in padlockable sections. J. Murphy & Sons requested access in two places to the chamber so EJ provided new internal ladders and designed two hinged assisted covers over the ladders with fall protection grids to enhance operator safety. During the approval stage Thames Water requested ventilation for the chamber so an additional upstand cover, located in the least trafficked area, was added to allow for this. Installation was safely carried out over 5 days using the approved framework suppliers for crane and access equipment. |
|||||||
|