CSO scheme
Queen Alexandra Bridge
Client
|
Overview As part of the Queen Alexandra Bridge CSO scheme, specialist contractors Lumsden & Carroll had a requirement within the 15,000 mm diameter CSO chamber for several special access points. Their brief was to produce 6 number 3000x2000 mm access systems which would allow water authority personnel to inspect and maintain their equipment in each of the two CSO’s in a safe and hazard free manner. Security and ‘single person operation’ being crucial features.
The EJ 1680 series multiple leaf assisted lift cover proved to be the solution as its design allows many optional extras to be fitted i.e. removable working platforms and recessed internal padlock points along with standard features like the stainless steel torsion springs and its unique Torkey operated ‘Lock and Lift’ system. |
|||||||||
|