Cobham Sewage Pumping Station
Asset hardening & safety upgrade
Client
|
Overview EJ carried out a full site survey and design proposal for the replacement of existing GRPcovers deemed unsafe / not suitable for the day to operations of a wet well at Cobham sewage pumping station in Surrey.
Working with the clients project managers to get operational feedback, EJ designed a bespoke fabricated steel, ‘L’ shaped, hybrid upstand cover with multiple secondary hinged upstand covers for access. EJ installers safely removed the existing GRP covers, steelwork and installed the new cover |
Before |
After |