Thames Water
Engineered solution enabling safe access to chamber – covers with anti-slip, handrails, and ladders
Client
|
Overview Eight2O / Trant were looking to increase the chamber height by approx. 900 mm to allow operatives to stand inside the existing buried chamber without the risk of injury enabling safer working practices.
The requirement was for two new internal ladders combined with access points to SR3 security installed on top of a multiple upstanding cover. |
||||||
|